London Jobs |
Manchester Jobs |
Liverpool Jobs |
Nottingham Jobs |
Birmingham Jobs |
Cambridge Jobs |
Glasgow Jobs |
Bristol Jobs |
Wales Jobs |
London Jobs |
Manchester Jobs |
Liverpool Jobs |
Nottingham Jobs |
Birmingham Jobs |
Cambridge Jobs |
Glasgow Jobs |
Bristol Jobs |
Wales Jobs |
Oil & Gas Jobs |
Banking Jobs |
Construction Jobs |
Top Management Jobs |
IT - Software Jobs |
Medical Healthcare Jobs |
Purchase / Logistics Jobs |
Sales |
Ajax Jobs |
Designing Jobs |
ASP .NET Jobs |
Java Jobs |
MySQL Jobs |
Sap hr Jobs |
Software Testing Jobs |
Html Jobs |
Job Location | Watton, Thetford |
Education | Not Mentioned |
Salary | £9.14 - £10.50 per hour |
Industry | Not Mentioned |
Functional Area | Not Mentioned |
Job Type | Permanent, full-time |
This is a role for an experienced Control Panel Fitter/Wireman. Fitting and assembly of control panels:· Marking out of back-plate and door by cross referencing GA, label diagrams, product specification sheets and any other supporting information.· Fitting of trunking and din rail to affix back-plate components. Ensure all items are fitted to the highest standards using the correct fixings and able to pass stringent QC checks.· Construct multiple bayed enclosures using the manufacturer’s standard assembly fixings and accessories. Ensure all enclosures have associated gaskets to comply with the relevant IP rating.· Manufacture of copper-work for power and earth systems to IEC 61439.· Install door components and associated door labels, to ensure all labels and nameplates are straight and level. Affix support rails in readiness for wiring.· Fit completed doors to enclosures and install MCCB/Isolator handlesWiring of doors and back-plates· Wire back-plate and door control cables in accordance to the wiring schematics and data information sheet. Ensure the correct cable crimps/ferrules are fitted and all cables are marked up with cable identification.· Install mains power cables ensuring the cable and cable lugs are of the right size and type and are correctly identified.· Fit power cables to components and tighten to the specified torque setting making sure torque paint is fitted and witnessed by a suitable employee.· Install earth cables throughout the enclosure to the earth bar ensuring all removable covers are connected.· Produce heat-shrink wire markers and components labels using dedicated printing machines.