London Jobs |
Manchester Jobs |
Liverpool Jobs |
Nottingham Jobs |
Birmingham Jobs |
Cambridge Jobs |
Glasgow Jobs |
Bristol Jobs |
Wales Jobs |
London Jobs |
Manchester Jobs |
Liverpool Jobs |
Nottingham Jobs |
Birmingham Jobs |
Cambridge Jobs |
Glasgow Jobs |
Bristol Jobs |
Wales Jobs |
Oil & Gas Jobs |
Banking Jobs |
Construction Jobs |
Top Management Jobs |
IT - Software Jobs |
Medical Healthcare Jobs |
Purchase / Logistics Jobs |
Sales |
Ajax Jobs |
Designing Jobs |
ASP .NET Jobs |
Java Jobs |
MySQL Jobs |
Sap hr Jobs |
Software Testing Jobs |
Html Jobs |
Job Location | Sunbury-on-Thames |
Education | Not Mentioned |
Salary | Competitive salary |
Industry | Not Mentioned |
Functional Area | Not Mentioned |
Job Type | Permanent , full-time |
Job Profile SummaryThe Greater Tortue Ahmeyim gas field is estimated to contain around 15 trillion cubic feet of gasenough to support production for 30 years or more. It will be the deepest development to date in Africa, with the subsea system located in ultra-deepwaterat a depth of around 2850m.The Greater Tortue Ahmeyim project will produce gas from an ultra-deepwater subsea system and mid-water floating production, storage and offloading (FPSO) vessel, which will process the gas, removing heavier hydrocarbon components. The gas will then be transferredto a floating liquefied natural gas (FLNG) facility at an innovative nearshore hub located on the Mauritania and Senegal maritime border.The FLNG facility is designed to provide circa 2.5 million tonnes of LNG per annum on average, with the total gas resources in the field estimated to be around 15 trillion cubic feet. The project, the first major gas project to reach FID in the basin, isplanned to provide LNG for global export as well as making gas available for domestic use in both Mauritania and Senegal.Reporting to the Tortue Start-Up Manager, the FPSO Start-up Engineer has a key role in delivery of the Start-up strategies and planning for one of the largest projects in BPs portfolio.The role is initially based, for a short period, in the ICBT Sunbury Office where Start-up development and readiness activities will be completed. This will involve finalising the Start-up Execution Plan, Start-up Strategies, Start-up Procedures, Start-upExecution Manual and Start-up work packs in readiness for the offshore execution phase. The Start-up Engineer will also be responsible for delivery of the start-up execution training for the FPSO operations team. The role will then transition to an offshorephase.The early offshore phase will include delivery of the start-up preparation procedures and completion of the assurance checks/walkdowns. The start-up engineer will also be involved with offshore, EPCCI Contractor lead, dynamic commissioning activities toensure they are completed to the correct standard ensuring risks to Start-up and ramp up are minimised.Once the installation reaches the Ready for Start-up milestone, the Start-up Engineer will be responsible for guiding the Operations team through the start-up procedures and working closely with the Start-up Lead to safely deliver start-up execution fromintroduction of hydrocarbon to final FPSO ramp up.This is a really exciting role that provides the unique opportunity to make a real difference in delivering the safe, reliable and compliant start-up of one of BPs biggest and most strategic projects.NOTE: after a period of UK based work, this role is will move to a rotational basis in 2nd half of 2023 (28days on/28days off) offshore on the GTA FPSO. Commitment to mobilise offshore for the duration of the start-up campaign is an essential requirementfor all applicants.Job AdvertWhat do you deliver